News Details

Flooding - Dillar Office Building

On Thursday, January 6, 2011 at 14:34 hours, Truck 611 responded to a reported flooding on the second floor of the Dillar Office Building located at 11525 Brookshire Ave.  Upon their arrival, Truck 611 found a broken 1 1/2" domestic water line in a 2nd floor female restroom that had resulted in major flooding to the 2nd floor, as well as significant water damage to the first floor.  Engine 61 assisted the truck company in performing salvage loss control measures.  Several salvage covers were used to protect medical offices and their sensitive medical equipment from damage.  Fire Department units were on-scene for approximately 2 hours mitigating the flooding.